This guide describes the design of a two-span integral concrete bridge, comprising precast pretensioned concrete beams with a reinforced concrete in-situ deck, to the relevant European Standards – applied in accordance with their UK National Annexes.
The guidance given in this publication is with respect to pretensioned concrete but the difference in the approach between BS 5400 and BS EN 1992-2, which generally treats prestressed and reinforced concrete in the same way, means that some of the guidance given in this document is equally valid in the design of a reinforced concrete or post-tensioned concrete bridge structure.
Technical
{PDF} Integral Concrete Bridges to Eurocode 2 :Commentary and a worked example of a two span bridge (Technical Guide No. 13) Concrete Bridge Development Group
$19.99

![[PDF] Introduction to Algebra: For the Use of Secondary Schools and Technical Colleges George Chrystal](https://digzon.com/wp-content/uploads/2024/04/5572c310143b075e3c32bba94eb6479b-d.jpg)
![[PDF] Nuclear Power - Technical and Institutional Options for the Future Committee on Future Nuclear Power Development, Energy Engineering Board, National Research Council](https://digzon.com/wp-content/uploads/2024/04/70958821e483e194d6cd11490ed28bde-d.jpg)
![[PDF] Top 100 Computer and Technical Careers: Your Complete Guidebook to Major Jobs in Many Fields at All Training Levels Michael Farr](https://digzon.com/wp-content/uploads/2024/04/42e87acd429e26fa1fc18e593943ed63-d.jpg)
![[PDF] Ejb 2.0 Development with Websphere Studio Application Developer IBM Redbooks, Ueli Wahli](https://digzon.com/wp-content/uploads/2024/04/7e07ea52c35b8a8833dc4d96be273e9d.jpg)
Reviews
There are no reviews yet.